| Sr.# |
Client/Project |
Equipment |
Scope |
|
1 |
SWCC
/ EPWTS |
SIMATIC S5 System |
Hardware &
Software Engineering, Testing & Commissioning of Redundant S5-155H & WinCC
System at Pumping Station & Tank Farm at Azizyah, Al-Khobar |
|
2 |
SIEMENS Belgium / Al Hunnay Water Transmission System |
SIMATIC
PCS7 System |
Software
Engineering, Testing and Commissioning, Installation Supervision and
calibration of Field Instruments. |
| 3 |
SWCC AK-2 Desalination Plant Al
Khobar Unit 0, 1, 2 & 3 |
DCS
TELEPERM XP |
Removal of old
DCS and Installation of DCS/BMS Panels & Hardware Testing. |
|
4 |
Ministry of Water / Sewege Scada
System for Dammam City, Phases I/II/III/IV |
Modicon
Premium & Motorola RTU |
Hardware
Engineering, Installation of RTU panels & Instruments and testing of
supplied system |
|
5 |
SADIP / Amiantit |
Modicon
Premium Automation System |
Design,
Supply, Installation, Testing and Commissioning of Automation & Instrument
System. |
|
6 |
ATC / SWCC RWTS |
View Star SCADA System and MODICON Automation Systems |
Engineering, Testing and Commissioning of Pumping Stations, Line Valves, High Point Terminal, Installation of complete Automation Systems |
|
7 |
AZIZ Co./SWCC QCF |
WINCC, SIMATIC S7, Redundant Sys., OTN |
Automation of Water Transmission System |
|
8 |
Gulf Vegetable Oil Co. (Nabati) |
WINCC, SIMATIC S7 |
Automation of Tank Farm & Integration of refinery |
|
9 |
SIEMENS / SEC Ghazlan Power Plant |
TELEPERM XP |
Engineering, Testing and Commissioning Engineering, Support, Complete dismantling and installation |
|
10 |
Al-Ittefaq Steel Factory, Dammam |
WINCC, SIMATIC S7 |
Hardware & Software Engineering, Support, Testing & commissioning |
|
11 |
SIEMENS / ARAMCO (at various Sites) |
Terminal Management system (TMS) |
Testing & Commissioning of S5-155H PLC Controllers, Emergency Shutdown & Tank Gauging Systems |
|
12 |
SIMENS/ SEC. Mina-2, Marwah, Ushyrah, Syllabi Substations |
SIMATIC S7 Redundant System |
Software & Hardware Engg., Testing & Commissioning of 2 Nos. S7-400H & 2 Nos. S7-300 PLCs. |
|
13 |
SWCC AK-2 Power Plant Al Khobar |
TELEPERM XP |
Installation of DCS/BMS Panels & Hardware testing |
|
14 |
Darul Taqnia Boot Desalination Plant Jeddah |
SIMATIC S7 System |
Software Engineering & Testing of 10 Nos. S7-200 & 1 No. S7-300 PLCs with WinCC as HMI |
|
15 |
SAFCO Jubail |
SIMATIC S5 System |
Replacement of old Panels, Control Wiring & Hardware Testing |
| 16 |
SW
CC Al-Khobar, Power & Desalination Plant. |
Services |
WINCC
Configuration |
| 17 |
Heckett
MultiServe Bahrain |
Services |
S5-95
U PLC Upgrading |
| 18 |
SABIC-KEMYA |
MODICON
QUANTUM |
Addition
of I/O Points in Incinerator PLC |
| 19 |
Marafiq (Jubail) |
ABB
DCS System |
Configuration
of Additional I/O points in DCS System. Supply, Engineering,
Installation, Testing & Commissioning |
| 20 |
Dunya Establishment |
Electro
– Mechanical work at Adwan Chemical Dammam |
Engineering,
Installation Testing & Commissioning of Electro – Mechanical work |
| 21 |
SWCC / PST |
Training
Simulators |
DCS,
TMS, BMS, PLC System
Supply, Engineering, Installation, T&C |
| 22 |
SEC / Wescosa |
SIMATIC
S7 System |
Automation
of Automatic Bus Transfer system (ABTS)
Hardware & Software Engineering, Installation, Testing &
Commissioning |
| 23 |
PST / Petrokemya |
SIMATIC
S7 System |
Up-Gradation
of Control System for Dryer
Hardware & Software Engineering, Supply Installation, Testing &
Commissioning |
| 24 |
SWCC AK-2 Power Plant
Al Khobar Unit 4&5 |
DCS,
TELEPERM XP |
Removal
of old DCS and Installation of DCS/BMS Panels & Hardware testing, |
| 25 |
Petrokeyma (SABIC) |
Modicon
Quantum PLC |
Up-Gradation
of PSA1 & PSA2 with Modicon Quantum PLC.
Engineering, Supply, Installation Testing & Commissioning. |
| 26 |
Adwan Chemical Co./Up
gradation of Sodium Silicate Plant |
SIMATIC
S7 System |
Design,
Supply, Installation, Testing & Commissioning of Automation &
Instrumentation System & associated Electromechanical works |
| 27 |
SABIC-SADAF |
MODICON
QUANTUM |
Upgrade
from 584 PLC to Quantum |
| 28 |
Siemens Ltd./Darul
Taqnia Boot Desalination Plant Jeddah |
SIMATIC
S7 System |
Software
Engineering & Testing of 10 Nos. S7-200 & 1 No. S7-300 PLCs with
WinCC as HMI |
| 29 |
MARAFIQ-Annunciators
Waste Water |
TWIDO
PLC |
Replacing
Rochester Annunciator with TWIDO PLC |
| 30 |
Petrokeyma
(SABIC) |
SIMATIC
S7 System |
Up
gradation of Siemens S5 to S7 PLCs
Supply, Engineering, Installation, Testing & Commissioning |
| 31 |
Petrokeyma
(SABIC) |
SIMATIC
S7 System |
Configuration
of WinCC Station
Supply, Engineering, Testing & Commissioning |
|
32 |
Hadeed - Danieli |
Siemens S7-400 PLC |
Services, Testing & commissioning of PLC |